Visual asset surveys

Visual asset surveys

Visual asset surveys

Visual asset surveys

With our diverse range of skill sets, we are able to offer various types of visual surveys ranging from asset data collection, categorisation of pipework and asset condition (i.e VS02), valve survey and investigation work.  All surveys are tailored to the customers’ requirements and offer valuable information to the asset owner.

We carry out a full line walking service, reporting any defects and remediating all raised defects with 28 days. This includes taking depth measurements to ensure the correct depth coverage of the pipeline. 

The posts we install include Aerial Marker posts (AMP), M4's and Cathodic Protection posts (CP). We have the capability to carry out CP repairs.